Monday, March 30, 2026

Tanroads executes 6tri/- road, bridge projects

 Sauli Giliard

DodomaTanzania Roads Agency (TANROADS) is executing 79 major road and bridge projects nationwide worth 6tri/-, as the country ramps up infrastructure investment to unlock its economic potential.

Acting Chief Executive, Eng Ephatar Mlavi, said in Dodoma yesterday that the agency has implemented road projects covering 5,769.74 kilometres.

Of these, 1,495.45 km have been completed to tarmac standard, while 3,677.67 km are under construction.

He added that, alongside development projects, the government allocates about 500bn/- annually for road and bridge maintenance.

ALSO READ: Tanroads completes upgrading key roads linking Tanzania and Rwanda

Eng Mlavi said another 2,052.94 km of roads and two bridges have completed feasibility studies and detailed design, while eight major bridges have been built over the past five years.

The completed bridges include J.P. Magufuli, Tanzanite, Msingi, Wami, Kiyegeya, Kitengule, Gerezani and Ruhuhu.

According to the agency’s report, the country’s road network had expanded to 182,164.41 km by December 2025.

Of this, 37,734.41 km are national roads managed by TANROADS, while 144,430 km fall under TARURA.

Eng Mlavi said the projects have also boosted local participation and employment, with 16,730 jobs created between January and December 2025.

However, local participation in major projects remains low at about 10 percent.

To address this, the agency has introduced measures including reserving all maintenance works for local contractors and allocating 10 percent of the development budget for training projects.

He added that projects worth 53.6bn/- have been earmarked for women contractors, while 30 percent of the development budget is reserved for special groups, including youth, women, the elderly and persons with disabilities.

TANROADS has also raised the procurement threshold for local firms from 10bn/- to 50bn/-.

Despite the progress, Eng Mlavi cited climate change as a key challenge affecting infrastructure.

“Extreme weather damages infrastructure. The government is implementing resilient designs and emergency projects,” he said.

He also pointed to rapid urbanisation, which has necessitated projects such as BRT systems in Dar es Salaam, road expansions, flyovers, ring roads and bypasses in cities including Dodoma, Arusha and Iringa.

“The government, through TANROADS, will continue strengthening construction and maintenance programmes using modern approaches to ensure roads remain accessible throughout the year,” he said.

No comments :

Post a Comment